Health and safety plan
The requirement for a Health and Safety Plan for construction was established by the Construction (Design and Management) Regulations (or 'CDM Regulations') in 1994. The regulations came into force on 31 March 1995.
The regulations were introduced to ensure that health and safety issues are properly considered during a project’s development so that the risk of harm to those who have to build, use and maintain structures is reduced.
The original regulations required that the Planning Supervisor ensure a Pre-Tender Health and Safety Plan was prepared for contractors setting out:
- A general description of the construction work.
- The programme.
- Risks to the health or safety of any person carrying out the construction work.
- Other information enabling the contractors to demonstrate the competence and adequacy of resources.
- Other information enabling the contractors to understand and perform their duties under the regulations.
The Principal Contractor then ensured that during the construction phase the Health and Safety Plan contained information about:
- Arrangements for the project to ensure the health and safety of all persons carrying out the construction work and all persons who may be affected by the work.
- Information about arrangements for the welfare of persons carrying out the construction work.
However, the CDM Regulations were substantially revised in 2007. Amongst many changes:
- The role of Planning Supervisor was replaced with a new, more hands-on CDM Co-ordinator.
- The Pre-Tender Health and Safety Plan was replaced with Pre-Construction Information, provided by the client and checked by the CDM Co-ordinator.
- The Health and Safety Plan was renamed the Construction Phase Plan (CPP), developed by the Principal Contractor.
NB: Rather confusingly, the Construction Phase Plan is still sometimes referred to as the Construction Phase Health and Safety Plan.
[edit] Related articles on Designing Buildings Wiki
- Automated external defibrillator AED.
- CDM.
- CDM Co-ordinator.
- Construction phase plan.
- Emergency plan.
- Health and safety file.
- Planning supervisor.
- Pre-construction information.
- Principal contractor.
- Safety.
- Safety audit.
[edit] External references
Six things to include in the health and safety plan for a construction site
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
Comments
Out of date information - CDM regulations updated in 2015